He started with the top board and ran that all around the room when we decided on where we wanted the top of the board to sit in the room. I think it was a genius plan and it turned out really great so I’ll try to explain it with these pictures. So, he finally got to working on it and came up with a plan to add battens to the existing baseboards, while still using them. But, we really wanted to get it done before the Holidays came, since this wasn’t what we wanted the house to portray as soon as someone walked in the door! He has weekends to get things done, so this one took a little longer as we worked through other projects to get to this one. That green paint was getting to me! And this is what we looked at for about 2 months, while Mark worked on the dining room and his man cave.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |